Approved Commercial Projects

This section lists commercial projects recently approved by the Planning Division.  

Updated October 13, 2017

        
Address Project Name Approval Date Project Description Current Status
7904 Auburn Blvd Multi-tenant Building 12/2015 Constriction of a multi-tenant building with automated teller machine Approved but no activity
8501 Auburn Blvd Big Lots and Rebounderz Jan 2017 Approval to reformat a vacant retail building into a Big Lots and an indoor recreation center Approved but no activity

7115 Fountain Square Drive

Medical Office Building

07/25/2014

Dignity Health has filed an application to construct a 3-story medical office building at the corner of Fountain Square Drive and Greenback Lane

Link

6141 Greenback Lane Shell Station Hydrogen Fuel 10/02/2017 Approval to amend site plan to allow the addition of hydrogen fueling pumps Recently approved
6550 Greenback Lane Quantum Care 06/28/2017 Applicant was approved to construct and operate a 32,386 SF two-story building 63-bed memory care and assisted living facility. No activity
7847 Lichen Drive Recycling Center 09/06/2017 Approval for the operation of an on-site CRV redemption center within the Raley's Shopping Center. Recently approved
7882 Lichen Drive Quick Quack Car Wash 04/12/2017 A car wash facility, including a 3,500 square foot building and 2,700 square feet of shade canopy was approved. Construction started October 2017
7935 Madison Ave Parcel Map 09/13/2017 Parcel Map approved to divide a shopping center into parcels. Recently Approved.  Land division only, no construction.
5421 San Juan Ave Muse Tattoo Studio 09/06/2017 Approval for the operation of a new tattoo studio within an existing tenant space Recently approved
5406 Sunrise Blvd Parcel Map 09/13/2017 Parcel Map approved to divide a shopping center into parcels. Recently Approved.  Land division only, no construction.
5415 Sunrise Blvd Alta Sunrise Retail and Medical Building   Approved new façade with addition of an outdoor plaza area to an existing retail and medical building. Under construction
7601 Sunrise Blvd Human Bean Coffee Kiosk 01/11/2017 A coffee kiosk with drive-thru and walk-up service. Construction plans submitted October 2017
7028 Sylvan Rd Bearpaw Shopping Center 12/18/2014 Modification to exterior of existing buildings Under Construction
7000 Verner Ave Verizon Communication Pole 09/13/2017 Approval to allow the placement of a new cellular communication pole that will be designed to look like a tree. Recently approved.
7101 Verner Ave Calvary Cemetery Admin/Chapel Expansion 09/23/2013 The project approved a Use Permit and a Design Review Permit to allow the construction of an approximate 17,250 square foot building for administrative offices, chapel, and columbarium within the Calvary Cemetery  No Activity